Generation Plan of APSCL Up to 2041 | |||||
Year | Installed Capacity (MW) | New Addition (MW) | Retirement Plan (MW) | Additional Increase (MW) | Total Generation (MW) |
1 | 2 | 3 | 4 | 5=3-4 | 6=2+5 |
2021-2025 | 1540 | 400+400+100=900 | 150+150=300 | 600 | 2140 |
Ashuganj 400 MW CCPP (East), Ashuganj 400 MW CCPP (Replacement Project), 100 MW Grid Tied Solar Power Plant (Phase-1) | Ashuganj Unit-4, Ashuganj Unit-5 | ||||
2026-2030 | 2140 | 600+100+1200=1900 | 53+195=248 | 1652 | 3792 |
Ashuganj 600 MW CCPP (Replacement Project), 100 MW Grid Tied Solar Power Plant, Patuakhali 1200 MW CCPP (Phase-1) | Ashuganj 50 MW GEPP, United Ashuganj 200 MW Modular Power Plant | ||||
2031-2041 | 3792 | 600+600+1200=2400 | 223+383=606 | 1794 | 5586 |
Ashuganj 600 MW CCPP (Phase-1) at B-type Area, Ashuganj 600 MW CCPP (Phase-2) at B-type Area, Patuakhali 1200 MW CCPP (Phase-2) | Ashuganj 225 MW CCPP, Ashuganj 450 MW CCPP South |