Wellcome to National Portal
Text size A A A
Color C C C C

সর্ব-শেষ হাল-নাগাদ: ১৮ অক্টোবর ২০২২

পরিকল্পনাধীন প্রকল্পসমূহের তালিকা

APSCL Master Plan-2022
Sl. No Name of the Power Plant Location Capacity
MW
Type of Fuel Commissioning Date Retirement Date
Generation plan of APSCL-2021 to 2025:        
1 Ashuganj 400 MW CCPP (East) Ashuganj, Brahmanbaria 420 Natural Gas 2022 2047
Sub Total = 420  
Generation Plan of APSCL-2026 to 2030:        
2 Raipura 120 MW Grid Tied Solar Power Plant (Phase-1) Raipura. Narshindhi 120 Sunlight 2026 2046
3 Ashuganj 450 MW CCPP (Replacement Project) Ashuganj, Brahmanbaria 450 Natural Gas 2028 2053
4 Patuakhali 1200 (2×600) MW CCPP (Phase-1) Kalapara, Patuakhali 1200 LNG (Imported) 2029 2054
5 Raipura 120 MW Grid Tied Solar Power Plant (Phase-2) Raipura. Narshindhi 120 Sunlight 2030 2050
Sub Total = 1890  
Generation Plan of APSCL-2031 to 2041:        
6 Ashuganj 600 MW CCPP (Replacement Project) Ashuganj, Brahmanbaria 600 LNG (Imported) 2031 2056
7 Patuakhali 1200 (2×600) MW CCPP (Phase-2) Kalapara, Patuakhali 1200 LNG (Imported) 2034 2059
8 Ashuganj 600 MW CCPP (Phase-1) at B-type Area Ashuganj, Brahmanbaria 600 LNG (Imported) 2037 2062
9 Patuakhali 100 MWp Grid Tied Solar Power Plant Kalapara, Patuakhali 100 Sunlight 2038 2058
10 Ashuganj 600 MW CCPP (Phase-2) at B-type Area Ashuganj, Brahmanbaria 600 LNG (Imported) 2041 2066
11 Patuakhali 1200 (2×600) MW CCPP (Phase-3) Kalapara, Patuakhali 1200 LNG (Imported) 2041 2066
12 Patuakhali 20 MWp Grid Tied Wind Power Plant Kalapara, Patuakhali 20 Wind 2041 2061
Sub Total = 4320